Betarq | Construction Management - Betarq
51
page,page-id-51,page-child,parent-pageid-17,page-template-default,ajax_updown_fade,page_not_loaded

Construction Management

3 / 3
  • Centro Cultural y deportivo La Lira
    Cultural and sports center Lira

    Betarq involved in the comprehensive rehabilitation of this landmark building and protected Sant Andreu in the Final Design, Construction Management and Performance Management.

    See project& Nbsp;
  • La fábrica del Sol
    Sun factory

    Betarq conducted the rehabilitation project and the construction of environmental education makes the Sun equipment management.

    See project& Nbsp;
  • Reforma Hotel Fairmont Juan Carlos I
    Reform Hotel Fairmont Juan Carlos I

    Works of internal reform of the Hotel Fairmont Juan Carlos I in Barcelona, where Betarq has made the adaptation project and is carrying out the direction of work, implementation guidance, quality Control and coordination of safety and security.

    See project& Nbsp;

Como parte de la Dirección Facultativa, es quien dirige el desarrollo de la obra en los aspectos técnicos, estéticos, urbanísticos y medioambientales, conforme al proyecto, a la licencia o demás autorizaciones administrativas (art. 12 de la Ley de la ordenación de la Edificación 38/1999).
Betarq realiza la Dirección de Obra a través de sus arquitectos del despacho, con misión única, siendo Proyectista o conjuntamente con la Dirección de Ejecución.
Comparte los valores de rigurosidad, procedimiento, método y voluntad de excelencia del despacho, con especial atención al cumplimiento del coste y plazo de la obra, como de la gestión y trazabilidad de toda la documentación generada.