CatalàEnglishEspañol
49
page-template-default,page,page-id-49,page-child,parent-pageid-17,minimum-core-1.0.4,ajax_updown_fade,page_not_loaded

Execution Management

3 / 3
  • Sabadell Swimming Club
    Sabadell Swimming Club

    Construction of a sports complex, as a second phase of the construction of the new Sabadell Swimming Club, with the construction of a multifunctional building, an Olympic swimming pool and several sports complexes.

    See project
  • Center for Comparative Medicine Trias i Pujol
    Center for Comparative Medicine Trias i Pujol

    The project has been selected at the FAD Awards 2019 in the Architecture category. Betarq has been a finalist for the Catalonia Construction Awards 2019 in the category of construction management.

    See project
  • Socio-cultural equipment Alella
    Socio-cultural equipment Alella

    Betarq carries out the direction of execution and CSS of the sociocultural Centre Alella. The project and realization of construction management has been done by Pol Femenias architects

    See project

The director of the execution of the work is the agent who, being part of the optional management, assumes the technical function of directing the material execution of the work and of qualitatively and quantitatively controlling the construction and quality of the built (art. 13 of the Law on the Planning of Building – 38/1999).
Betarq carries out the Execution Directorate with its own methodology, based on processes that guarantee both the quality of the project, the current regulations or the standards of good construction, with special attention to the intense monitoring of the work, the exhaustive economic control and the documentary registration of all processes.
The Hospital Sant Juan de Diós in Sant Boi de Llobregat (Barcelona), Phase II of the Sabadell Swimming Club (Barcelona) or the Nursery School of Vilanova del Vallès (Barcelona) are sólo unos ejemplos.